Step 1 - Call the Saint - Gobain Gyproc India Limited sales representative and give him all the relevant details of the project including the details of the contractor who is going to execute the project.
Step 2 - The Saint - Gobain Gyproc India Limited sales representative will then guide you to procure 100% genuine and authentic products from Saint - Gobain Gyproc India Limited authorized vendors and also give you the relevant specifications to be followed for the various systems.
Step 3 - The Saint - Gobain Gyproc India Limited sales representative should be informed when the material is procured and transferred to the site in order to ensure that genuine material has been received at site.
Step 4- The Saint - Gobain Gyproc India Limited sales representative should be informed once framing has commenced and involved through the entire framing process to ensure that the framing has been done to the specifications provided.
Step 5 - The Saint - Gobain Gyproc India Limited sales representative should be informed once boarding has commenced and involved through the entire boarding process to ensure that the boarding has been done to the specifications provided.
Step 6 - Once the jointing and finishing has been completed, the Saint - Gobain Gyproc India Limited sales representative should be informed so that we can do a final check to ensure all design and installation procedures have been followed. Once everything has been checked and certified you will be issued a SpecSure® Warranty Certificate.
Checks & Procedures to be followed to get best desired performance from our systems
The gypsum plasterboards must be stored in a dry and covered place, sheltered from rain and away from damp floors. They should be stacked horizontally at least 45 cm above the ground on wooden pallets. Max height of each stack should not exceed 1 meter.
The gypsum plasterboard systems must not be exposed directly or indirectly to exterior elements like rain, sun, snow and wind. All exterior facade work must be completed before interior boarding has begun else this will have an effect on system stability.
Support must not be taken from AC ducts, plumbing and other services as the vibrations from the same will result in cracks along the joints leading to system integrity failure.
Once the boarding is done, jointing & finishing must be completed within 2 weeks to avoid exposure of boards to high moisture which may cause sagging of boards.
Always follow 3 step jointing & finishing process with genuine jointing and finishing compounds and paper tape to get a smooth monolith finish.